DESIGN AND SUPERVISION OF THE SOLAR SYSTEMS FOR AEFE 59 SCHOOLS IN LEBANON
Installation of solar systems (hybrid, coupled or on grid systems) tailored for the need to 59 principal French schools across Lebanon
FORSA II – INSTALLATION OF HYBRID SOLAR SYSTEM TO 78 SCHOOLS ACROSS LEBANON
Installation of hybrid solar system to 78 schools across Lebanon
SOLARIZATION OF A WATER WELL IN QAAQAAIYET EL-SNOUBAR-SOUTH LEBANON
Design and supervision of Solar Pumping system the installation is around 132 kwp (240 modules) for Solar pumping for a pump size 100 HP
AIN BAALBECK SOLAR PUMPING STATION
The project aim to equip the pump station with a solar water pumping system of 200-Kilowatt Peak (KWp, capacity to operate a 150 HP (horsepower) pump. The solar systems include solar panels, steel structures, civil works, Variable Frequency Drive (VFD), fence and CCTV and an online control and monitoring system with all accessories
WATER PUMPING STATION IN KHERBET ROUHA WATER PUMPING STATION, NABI CHIT WATER PUMPING STATION NO. 13 , FEKHA SPRING WATER PUMPING STATION; RAS EL MEL ‐ HERMEL WATER PUMPING STATION
Design and supervision of Solar Pumping system to 4 water pumping stations.
ZEFTA SOLAR PUMPING STATION
Design and supervision for a solar system for powering two water wells for domestic water network which feed all the village. The works includes the rehabilitation of the well and control room. One of the wells is only powers by EDL the system is expected to be 118.8 kwp solar pumping system on an elevated structure on a public land 765 sqm.
Header
Installation of hybrid solar system to 78 schools across Lebanon
Header
Installation of hybrid solar system to 78 schools across Lebanon